Have questions? Our expert AI assistant can help with CBAM queries.
UK CBAM · Live 1 January 2027

The UK is about to price the carbon in everything you import.

A second carbon border, a second rulebook, a second set of suppliers to chase. Carbon Glance handles UK CBAM the way it already handles the EU's — one platform, both borders, no duplicated effort.

Countdown to 1 January 2027

––Days
––Hours
––Mins
––Secs

UK CBAM applies to goods imported from 1 January 2027. The emissions you are charged on are the ones your suppliers are producing right now — and most of them have never been asked for the data.

The rules in four numbers

What UK CBAM actually asks of you

Sectors in scope
5

Aluminium, cement, fertiliser, hydrogen, and iron & steel. Glass and ceramics were dropped.

Registration threshold
£50,000

Rolling 12-month value of CBAM goods. Cross it and you must register with HMRC.

Who pays
Importer

The UK liable person carries the charge — not the overseas manufacturer who holds the data.

First return due
31 May 28

Covering all of 2027 in one annual return. Quarterly periods begin from 2028.

Two sides of the border

Your CBAM problem depends on which side you’re standing on

The liability sits with the UK importer. The emissions data sits in an overseas factory. Everything hard about UK CBAM lives in the gap between those two facts — so we built for both ends of it.

Without Carbon Glance

You are the liable person. Every supplier who doesn't send data pushes you onto the global default value — a single figure applied regardless of where the goods were made, no carbon price relief for carbon already paid abroad, and a bill you couldn't forecast or price into your contracts.

With Carbon Glance

Start from the Import Item Report you can already pull from HMRC's Customs Declaration Service (CDS). We read it, match every line to its commodity code and flag the CBAM goods in minutes — so you see your liability as it accrues, not in May 2028 when it's too late to act on it.

Know the number before HMRC does

  • Upload your HMRC CDS Import Item Report and get a working baseline the same day — no integration project, no data entry.
  • Track the £50,000 threshold on a rolling basis, so registration never sneaks up on you.
  • See default-value exposure in pounds — exactly what each missing supplier response is costing you.
  • Claim carbon price relief for carbon already paid overseas, with the evidence attached to the entry.
  • File with a full audit trail, because a CBAM return is an assertion to a tax authority.
See it on your own CDS report
Liability overview · Accounting period 2027
Iron & steel£34,195
Aluminium£17,938
Cement£6,220
Verified supplier dataGlobal default value

7 declaration lines still on the global default value. Closing them is worth an estimated £6,420 against your current liability.

Manufacturer / trader — outside the UK

Holds the data

  • Maps installations and production routes
  • Calculates direct, indirect and precursor emissions
  • Attaches verification and carbon price paid at origin
Liable person — inside the UK

Carries the liability

  • Matches the data pack to CDS declaration lines by commodity code
  • Replaces the global default value with actual verified data
  • Applies carbon price relief, files the return and pays HMRC
Don't assume it's the EU scheme again

Six ways UK CBAM breaks the habits you just built

If you spent 2024 and 2025 getting EU CBAM right, most of that work transfers. The mechanics underneath do not. These are the differences that change what you actually have to do.

TopicEU CBAMUK CBAM
How you payBuy and surrender CBAM certificates at a weekly ETS-linked priceA direct charge calculated on your return. No certificates to buy, hold, or surrender.No trading desk needed
SectorsAluminium, cement, electricity, fertiliser, hydrogen, iron & steelThe same five, minus electricity. Glass and ceramics were consulted on and dropped.
Default valuesCountry-specific default values, plus benchmarks reflecting free allocationOne global default value per CN code — no country-specific variants, no benchmarks. Carbon price relief is specified per sector.One number, everywhere
ThresholdMass-based de minimis per importer per year£50,000 rolling 12-month value of CBAM goods.Value, not tonnage
Reporting rhythmQuarterly through the transitional period, then annualOne annual return for 2027, then quarterly from 2028.It gets tighter, not looser
Who is liableThe authorised CBAM declarantThe liable person — whoever is responsible for the CBAM goods when they enter the UK. Agents can act, but the liability follows the goods.
Talk to a CBAM expert
How it works

Three steps, in the order the data actually arrives

  1. STEP 01

    Start from your CDS report

    Pull your Import Item Report from HMRC's CDS and upload it as-is. We read the commodity codes, net mass and country of origin already in it, and flag every line that falls in scope — including the goods you didn't realise were covered.

    Output: your CBAM exposure, quantified in minutes

  2. STEP 02

    Collect supplier data

    We request emissions data from your suppliers in their language and their units, chase the ones who go quiet, and check what comes back before it ever touches your return.

    Output: verified data replacing default values

  3. STEP 03

    File and pay with confidence

    Apply the sector rate, claim carbon price relief for carbon already paid overseas, and file — with every figure traceable back to the declaration line and the supplier data behind it.

    Output: a return you can defend

UK CBAM, answered plainly

Find quick answers to the most common questions.

Get ahead of 2027

Two borders. One platform. No second scramble.

Bring your CDS Import Item Report and see your UK CBAM exposure on your own data — and find out which suppliers you need to start chasing today.

30-minute call · No obligation · Bring your CDS Import Item Report